Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 9 results ...

Alashwal, A M and Al-Sabahi, M H (2018) Risk factors in construction projects during unrest period in Yemen. Journal of Construction in Developing Countries, 23(2), 43-62.

Enshassi, A, Shakalaih, S and AlKilani, S (2019) Strategies for community participation in pre-disaster phase in the gaza strip, palestine. Journal of Construction in Developing Countries, 23(2), 107-27.

Kaushik, A (2019) Gating and syntactical analysis of spatial configuration of sectors of Gurgaon (Gurugram), India. Journal of Construction in Developing Countries, 23(2), 87-106.

Moza, A and Paul, V K (2019) Analysis of claims in public works construction contracts in India. Journal of Construction in Developing Countries, 23(2), 7-26.

Ofori, G (2019) Construction in developing countries: Need for new concepts. Journal of Construction in Developing Countries, 23(2), 1-6.

Olugboyega, O (2019) Specific roles of builders in building information modelling processes. Journal of Construction in Developing Countries, 23(2), 27-42.

Renuka, S M and Umarani, C (2019) Effect of critical risk factors causing cost deviation in medium sized construction projects. Journal of Construction in Developing Countries, 23(2), 63-85.

  • Type: Journal Article
  • Keywords: construction projects; cost deviation; India; risk management
  • ISBN/ISSN: 1823-6499
  • URL: https://doi.org/10.21315/jcdc2018.23.2.5
  • Abstract:
    Risk is the outcome of an event which may be predicted on the basis of statistical probability. Construction projects have inherent risks associated with it. The main aim of this paper is to identify the critical risk factors and to propose a model to find the probability of cost deviation in medium sized construction projects. A total of 46 risk factors were shortlisted based on pilot study and experts' opinion. A questionnaire survey was conducted among 223 various construction professionals each representing one project i.e. from 223 different projects. Based on factor analysis, 46 risk factors which influence the cost deviation in construction projects were classified under nine key risk groups viz. project scope and evaluation risk, work environment risk, documentation and legal framework risk, construction and operational risk, resource productivity risk, knowledge sharing risk, site supervision risk, financial viability risk and lean construction risk. Logistic regression analysis was also carried out to develop a model to find the probability of cost deviation in construction projects. It is concluded that the risk groups such as project scope and evaluation risk, site supervision risk, knowledge sharing risk and lean construction risk are having higher influence in the cost deviation in medium sized construction projects. By setting the effective baseline of the project like estimation of original project cost and detailed project report, cost deviations in medium size construction projects can be eliminated. Detailed recommendations are also provided. © Penerbit Universiti Sains Malaysia, 2018.

Sadafi, N and Sharifi, M (2019) A study of the concept of iranian traditional architecture in bazaars and shopping centres. Journal of Construction in Developing Countries, 23(2), 151-65.

Saleki, S and Bahramani, S K (2019) Designing a low-carbon building via lcb method 3.0, case study: An educational building in tehran. Journal of Construction in Developing Countries, 23(2), 129-50.